
.png)
RIVER RESINS
URETHANE CONCRETE
INDUSTRIAL GRADE | FDA APPROVED FORMULA | JOBSITE READY
RR 7000 SERIES HF
URETHANE CONCRETE
1:1:1 TROWEL APPLIED HEAVY DUTY PUC
Why an installer would choose HF
-
When failure is not an option in high-abuse zones
-
Longer service life in freezers and processing lines
-
Handles punishment that would destroy thinner systems
-
Ideal upgrade when SF or MF won’t hold up long-term
​
What problem does this solve?
-
Built for extreme service conditions where standard slurry or MF systems won’t last
-
Handles severe thermal shock, heavy impact, abrasion, and aggressive chemicals
-
High-build system for areas with forklift traffic, steel wheels, and heavy equipment
​​
Where should I use it?
-
Food & beverage processing facilities
-
Chemical process plants
-
Pharmaceutical facilities
-
Wet processing and packaging areas
-
Commercial kitchens
-
Freezers and coolers
​​
How tough is it? (Performance at a glance)
-
Compressive strength: 7,800 psi
-
Impact resistance: >160 in-lb
-
Bond strength: 100% concrete failure
-
Designed for heavy traffic and forklift operation
-
Thermal shock resistant / steam cleanable
-
Fungi resistant (ASTM G-21)
​​
How thick does it go on?
-
Typical system: ¼" – â…œ" finished thickness
-
Trowel-applied monolithic floor
-
Can be extended beyond 1" with aggregate for extreme builds
​​
How fast can I get on it?
-
Pot life: ~15 minutes
-
Light foot traffic: 12 hours
-
Heavy foot traffic: 24 hours
-
Full cure: 7 days
​
What conditions can I install in?
-
Ambient: 40–85°F
-
Material: 50–80°F
-
Not for wet concrete (moisture tolerant ≠ standing water)
​Coverage & kit info
-
Unit includes:
-
½ gal Part A
-
½ gal Part B
-
HF filler bag
-
Liquid pigment
-
-
Coverage: ~23 sq ft per unit @ ¼"
​​
Slip resistance & finish
-
Trowel-finished surface
-
Slip resistance controlled through finishing technique and topcoat selection
-
Meets ADA recommendations when properly detailed
​​
What should I watch out for? (Installer realities)
-
Not color stable—expect color change over time
-
Requires CSP-5 or greater surface prep
-
Keyways required at all terminations and penetrations
-
Moving joints will reflect—must be properly detailed
-
Heavy material—crew coordination and timing matter
-
Installation by trained polyurethane concrete installers only
